Project: Rio Tinto Iron Ore (Pilbara sites, Western Australia) Loading Systems

Services:

  • Design, instrumentation and control system supply and commissioning for the Brockman 4 Emulsion loading and dispense upgrade project.
  • Design, instrumentation and control system supply and commissioning for the West Angelas Jet A1 refuel system.
  • Design, instrumentation and control system supply and commissioning for the 6 Mile Diesel refuel system.
Go to Top